The Archive · 1892

Dredging Near Shanghai

The high authorities of the Province of Kiangsu present a report concerning the dredging of the channel of the Wusung River, by which apparently they mean the river that is known as the Soochow Creek, This watercourses, sty the memorialists, is of great importance to the agriculturists of the surrounding country; and a statement has already been made to the Throne of the work undertaken in connection with it by the soldiers and common people working together. The funds used were taken from the surplus relief contributions, the granary profits and the annual river works funds of the adjacent districts. The section of the river which was cleared out, was that from Henglowk'ou, on the east side of the meeting place of the Four Waters, to the Ta-wang Temple at Sinza, the total length being 125,520 feet. The amount of earth carried away was 859,375. fang (fang is a hundred cubic feet); and the cost for labour and materials, including embankment making as well as dredging, Tls. 160,095.

Text read from the printed page and cleaned; old type leaves the occasional error.

Your account