The Archive · 1892

THE OPENING OF THE SWIMMING. BATH. CLUB

16th July. A NOTABLE. event: takes place to-day in. the: opening of-the Swimming Bath on the ground within the Race Coarse. The need of such an establishment has Tong -been felt in Shanghai, as those residents who wished to indulge in a swim" have been perforce obliged to berake themselves to the Hwangpoo, wherein & dip:'was only obtained under certain unavoidable disadvantages, Had it been possible, the Shanghai Swimming Bath would have been a public establish ment, but' there were serious obstacles in the way of effecting this without very great' delay.' There was, however; a chance of erecting a Swimming Bath under the control of a private club, which would: allow -a number of residents to partake of its privileges, but' it naturally followed. that those favoured residents would have to. pro+ vide the funds for erectitig the building and: stand all risks' connected with' it. he inception of the scheme is entirely due to Mr: Charles' Mayne, who "not only..'prepared the plans, estimates, etc,, for erecting an inexpensive open air Swimming Bath, but generously offered his time and valuable professional services to carry the scheme to fruition. Fortunately Mr. Mayne was enabled to impress the feasibility of his scheme on several members of this community, from among whom ay energetic provisional committee was formed for the proposed Swimming Bath Club, and this' Committee was successful in secur~ ing Mr. G.A. Matthews as the Honorary Secretary and the skilled' assistance of Mr. Charles. Mayne as Honorary Engineer... No-time was lost in obtaining sufficient subscribers to the scheme, and good as'the'cause undoubtedly was the'task was by no means a light one, owing to the commercial depression under which Shanghai was suffering. Nothing daunted Mr. Matthews persevered, and to him it is owing in a great measure that Mr. Mayne's plans sary finds were guaranteed, a governing were put to-practical issue, The neces-

Committee was appointed, a convenient site "obtained; and: Mr. Mayne™ was authorised to carry his plans into execution;'so that the Bath could: be used during' this summer.

has-been'erected in a very satisfactory Phe building, which is now completed, marine bythe contractor, Yung-chang, under Mr. Mayne's supervision. It is, situated inside the Race Course on the east side of the entrance to the Cricket, Ground; aid is "122° th by 52 ft. over "all. 'The building is so" placed that, looking from. the Grand Stand to. the "far' side of the - course, ibis in a direct "line with the Cricket Ground pavilion; and: the dimeuisions have been purposely kept dows so as fo offer no obstruction to the. view from the Grand Stand. 'The bathing tank i 100 feet in-length by 82 feet in-width, 6 feet deep at' the deep end and 3 feet 6 inches at the shallow end, and will hold 95,000 gallous of water, supplied by-the Shanghai Waterworks Company bya2inch main and a spray pipe. The tank is built entirely of cement concrete, composed of three parts small broken granite; three parts sea sand and one. part of Portland cement supplied by the Onoda Cement Ca. of Japan, The bottom of the bath is 2 feet 6 inches: thick, 1 foot being of lime concrete and 1 foot 6 inches of cement concrete; the walls vary between 2 feet 6 inches and 2 feet in thickness. The whole of the inside is plastered with two coats of cement plaster trowelled to a very smooth surface, the finished colour being a light grey. The cul of the bath is four feet above ground level. The dressing boxes—53 in number, 5 feet by 4—are of wood and are roofed in to the of the water. A refreshment bar, shower bath; lavatory,' hot water baths, etc., are also provided there ate three diving boards, and the water area will be covered with a mat roof. The bath will be emptied into inch pipe drain, and arrangements have bod Race Gontse ditch by a fie teen trade for the water to flow in and out continuously. he total height of the building above ground level is thirteen feet, special care having been taken not to obstruct the view of the course from the Grand Stand. The total cost of the building, exclusive of water main and fittings, will be Tls. 4,900, or less than £1,000 sterling even at the present low rate of exchange, and it will be, considering its size, cheapest permanent swimming bath ever erected. As a matter of interesting comparison, we give the sizes. of some of the recently erected swimming baths. in London and the provinces, but it must be borne in mind: that all of them are public baths, and supply very large populations.

Camberwell, London 120ft. x 35ft. St. George'sintheKast, London 73: x30 Islington (No. 1), Land: 90 x40 do. (No.2), 132, x40 Cheetham, chester x27 Aston, Birmingham 8 x39 Barley, Yorkshire 7% x30

Text read from the printed page and cleaned; old type leaves the occasional error.

Your account