The Archive · 1892

J. A. Leoxarp, Esq

U.S. Consul-General and Senior Consul — Volunteers—Resignation of Chaplain.—

Letter from the Rev. Mr. Hodges is read resigning his commission as Chai of the Volunteer Corps, owing to his intended departure from Shanghai on a year's furlough, and intimating that Archdeacon Moule is willing to arrange about a Church Parade should one be required during his absence.

Decided to inform Major Holliday of this resignation, and to intimate to him that the Council ace of opinion that it is not necessary to fill this vacancy.

Lighting.—Letter from the Shang! Electric Ca. is read intimating that the are lamp at Ewo Terrace is ready for lighting, Works Matters.—The following report by the Engineer, viving particulars of the works completed during November, and of those now in progress is submitted and ordered to be published.

Shanghai, 6th December, 1892, The following works have been completed North Szechuen Road bridge, Sinh repairy Buipars.—Repaiting, painting, &c., the

have been made to the North Kiangse Road bridge.

Cuenxs.—Dredging the Hongkew Creek, in front of the Fearon Road scow.

Cemurentes.—Fixing number plates to the grave spaces in the New Cemetery.

Drarsacr.—The Szechuen Road drain has been rebuilt and extended across the Soochow Road into the Soochow Creek. west of Museum Roads has been extended The 12 pipe drain in the Soochow Road to and connected with the Szechuen Road sewer. tension, north of Seward Roed.

Laying 12" pipe drain in the Dent Road ex-

Laying 9" pipe drain in the Market Lot, Manholes have been built and fitted with iron covers in the Soochow, Hankow und Honan Roads.

Gullies have been built and fitted with iron covers in the Soochow. Szechuen, Broadway, Dent and Woochang Roads.

Gullies have been rebuilt and fitted with iron covers in the Museum, Soochow and Szechuen Roads.

The drain-mouths and manholes in the English and Hongkew Settlements have been cleaned.

Seeger Pavemests.—Laying composi Between the Bund and Szechuen Road; and wwement in the Pekiog Road, north side,

Museum Road, east side, between Peking and Soochow Roads; and approaches to the North Szechuen Road bridge. the Broadway; and'in the Fuhkien Roads, Cie-ravix.—Repairing chip-paving in

Text read from the printed page and cleaned; old type leaves the occasional error.

Your account