The doors, windows, venetian. shutters, staircases, and other joinery of this building have.been fiked, and the flooring tiles laid.
Central Fire' Station, Honan Koad.—The fixing of the joinery' work of the main building has been commenced. The necessary alterations to the footpath in front are being proceeded with. The walls of the stables have been built and are being roofed in. brick wall around this Cemetery Old Cemetery, Pah Sion Jao—The new has been completed with the exception of the length along the extreme western boundary, the building of which has to be postponed, pending the filling in of the large pond adjoining this side.
Electrical Sub-Station.—An Electrical Sub-Station, having a chamber 7 ft. square, built of brick with an iron roof, is being erected in the Hongkew Park.