The Archive · 1905

Concrete Ware

The following concrete ware has been made at the Council's Hongkew Depot 1 1 1246 1625 271 302] 5444

99 reeks and River, completed with the exception of Sainte Bridges. Markham Road Bridge is now Slight repairs are being made to the Yangtszepoo Road Bridge.

Bundings.—Five hundred foot of new stone slope has been completed alone the Bund foreshore, and mooring rings have been placed at intervals of about 100 feet.

Three hundred and eight feet of wooden bunding along Sinza Road Chip Yard has been repaired, and repairs to the North Yangtszepoo Road bunding are under Woochang Road pontoons hae ba oontons and Landing Stages.—The repaired and painted. All pontoons have been examined and four of them supplied with ten additional life buoys,

Text read from the printed page and cleaned; old type leaves the occasional error.

Your account