on which it is to erect a The surface of the groand of ing shall be Teed to the finished level the back of the footpath, or where there is no existing footpath, the level of the crown of the nearest finished road.
The ground floor level of every building shall lio at least six inches above the finished level of the back of the footpath, or the crown of the road s the case may be.
The boarded floor of every room on the lower story shall be laid on " bed of well-rammed tar concrete at least three inches in thickness to consist of one of the following mixtares, viz, hot tar per fong of ates three inches in thickness, Broken bricks to pass through one-half ring and cinders in equal parts by measurement well mixed with fifty gallons of hot tar per fong of area three inches in thick-nes Cinders mixed with forly callous of hot tar per fong of area three inches in thickness.
The whole to be laid apon three inches of good lime concrete so that there hall be no space between the floor boards and the tar concrete, In the event of the adoption of the above recommendations, paragraph three of this article should be deleted.
Text read from the printed page and cleaned; old type leaves the occasional error.