To the Editor of the "Norta-Catva Dairy News." turally looked at the eud of that time for an amelioration of the con: the bridge. The work has been apparently ' finished" several times, but-on each occasion operations have, after a rear, which no doubt the contractor recommenced an the bridge positive danger to those using it. During thi week I have seen right out of their position when being passed over, and ings not only causes ence but pain to s cyclist, and ricsha fare. Beside this in some places there is a drop, or rise s the case may be, from one rough plank to the next of several inches.
To add to the discomfort of the public, the Szechuen road has been blocked for over a week, and the traffic '3 over the Chapoo Bi hss consequently been very heavy. For weeks, long-splintered planks have been the terror of motor-drivers and cyclists, and what must the coolies suffer with their bare foot From one year's end to the other this road and bridge is being constantly "patched" from one cause or other. When, will this continual patching be finished and the bridge and road put into something like decent condition? On the bridge the tyres of my cycle have suffered badly.
Tam, etc, Twice Poncrorep witty 4 Ween 8th June.
Text read from the printed page and cleaned; old type leaves the occasional error.