sq. yds. Third layer of zink-studs of A. construction.
5,395 Previously laid...
9,994
15,389 which completed the zink-works in this training work over ite whole length of 680 fect. Piling: 131 50-feet piles were driven through the base work of zink-studs in three rows on the south side over a length of about 180 feet. The crib-work at Prince's Wharf connecting the training work with the shore has been raised to about its full height, as designed, but its upper part by a temporary construction only, at the contractor's expense, as a landing stage for stone transport, Solidifying zink-staks: Sandy soil dredged from Junk Channel (Dredging Contract) deposited on the above mentioned zink-studs:
13,164 enb. yds. Previously 13,779
Total Mach greater quantities will soon follow.
Sea Dyxe.—Second layer of zink-studs of A. construction. 189 q. yds, Previously Isid, bottom layer 5,193 sq. yds.
Total 5,382
Fascine mattress work.. 1,101 Previously Total 2,193, which completes the first length of 930 feet from the shore. Piling: piles 18-feot long driven this quarter, 499 pieces.
Text read from the printed page and cleaned; old type leaves the occasional error.