Developments to Follow Completion of Kirin Line Mukden, Fob, 22.
Pians are already being laid for the commencement of further railway lines in Eastern Manchuria (Kirin and fengtien) immediately upon completion of the Hailung-Kirin line now being vigorously Pushed on by the Chinese authoriies. One of these projected lines to run from Chaoyang, nent Hai-Jung, southeast, by way of the Shabsungkang coal-feld, Tunghua. and Maoerhshan, to Linkiang the Yalu river, a distance of about 160 miles. Another projected line would start from Chaoyang east wards to Lungehing, Chientao, through Mengkiang, Tien-ug, Toutao, Erhtao and total distance of about The former line, besides providing an outlet for the coal-
up territory suitable for rieefeld mentioned, would. also open farming, but the engineering diffieulare stated to be considerable.
The latter line, on the other hand, is said to offer far better economic Prospects, running as it would close to the extensive virgin forest zones on the upper Sungari, as well as in Fusing, Antu and Holung, talao said to afford fair prospec for sericulture and stock-farming. Which one of these two projects is to be given preference has not yet been decided, but influential people these provinces take a keen interest in both of them.
A through traffic agreement is reported to have been signed in Dairen between the Japanese South Manchuria Railway Ca. and—the Chinese Mukden-Hailungehens Railway. The terminus of the latter Ddeing east of Mukden City, there is fas yet no connection between the two" railways, but the agreement provides for the construction of a connecting line, about five miles in length, and the work will be com menced ax soon as weather conditions permit, The volume of goods earvied by the Mukden-Hailungcheng line-is estimated at about 100,000 tons, but the fertile country it traversen is capable of supplying asmuch larger amount of freight when folly doveloped.—Renter.
Text read from the printed page and cleaned; old type leaves the occasional error.