Dizwell Road.—The mua deposited on the section of this road south of the Sawjinkiang Bridge upon the completion of the bunding being now consol dated, the Engineer's proposal approved that the road be chip-pared for its fall width and a cement path 4 feet wide laid on the Hongkew Creek side at an estimated cost of Tls. 3,915.
Hart, Brenan and Edinburgh Roads,—The sections of these roads of which it was decided to metal a 12-foot strip in 1911 (vide Manicipal Gazette September 21, 1911) which work was subsequently deferred, will now be completed,
Text read from the printed page and cleaned; old type leaves the occasional error.