The operations now in progress in the vicinity of the Nanking Road bridge were commenced at the New Year, and give evidence of the rapidity with which the work is being pushed forward. On an average about seventy feet of pipes are being laid per day, and when the amount of preliminary work that has to he done before the pipes are Inid is con-dered, the progress highly satisfactory.
At a first glance, one wonders that so much real progress is being made. The top surface of the creek bed is slimy filth, the ae: cumulation of years, "This goes down to a depth of about three feet, when more solid substance is met with, The method of laying the pipes ix extremely interesting, although the numerous and entire. ly different odours make it far from pleasant from an onlonker's. point of view. The water is drain. ed off by a6 in. centrifugal pump. which is at present working from the vicinity of Foochow Road. A small dam has been built across the orerk at this point, and the water is pumped from the first portion, over the dam and into the other part of the creek-the Yangkinepang side, The slimy nature of the liquid necessitates the use of a atraincr at the mouth of the pipe leading to the pump, otherwise a "choke would result.
Text read from the printed page and cleaned; old type leaves the occasional error.