The Archive · 1930

Steam Coaches to Woosung

New Service Using British Made Vehicles The strange vision of an aluminum Isequered coach speeding down s the Woosung railroad track at a Fate of forty-five miles an hour without a locomotive or any visible signs of an engine brought scores of gaping Chinese along both sides of the track on March 31, House windows were packed with heads, women stopped doing the family Inundry in the creeks and gazed with wonder, and children waved their hands with excitement.

Not so many years ago the railroad tracks were pulled up and sent to Formosa when the Chinese decided they didn't want any railways in China, Now they have changed their minds. The Sen-tind Cammelt steam coach is the first inter-urban means of transportation of its kind in China, Twelve coaches will run a continuous se:

between Shanghai and Woosung Forts.

The coaches are of zine with og outside finish of aluminum. Each has a senting capacity of 129 third class and 14 first class passengers, The engines, contained in the coach itself, are of 107 lip., 174 Ib. of steam per brake horse power: The coaches are fitted with Westinghouse Air brakes, electric light and steam heating. They are lubricate to ed by the Vacuum Company. The same type of coaches are used as "feeders" in Great Britain, The order for these couches was placed with Messrs. Cammell-Laird in December, 1928, through Messrs, Scott Harding & Ca. Delivery of the coaches at Woosung from Engind_was completed on November 12, 1929. The bodies were built at Woosung under the supervision of the railway's locomotive department.

On March 31 a special coach left the North Station for Woosung Forts at 10 o'clock in the morning and left Woosung at 1140. Arriving at Woosung Forts the party was taken to the Bellevue Hate! where tea, cakes, and sandwiches were served. Mr. W. T. Liu, who is the director of the service operations, made the opening speech. Mr. E. G. Jamieson, acting British Commercial Counsellor, congratula ated Mr. Liu on the completion of the new railway system and thank. ed him for the hospitality extended to the guests assembled. Mr. I. Tuxford, chief engineer of the Shanghai Nanking Railway, gave 5 brief speech concerning the bright Prospects of. future railroad development. Lieut. Wong spoke in behalf of Admiral Yang who could not be present.

The following guests were prose: at the opening: Mr. J. Lockhar Mr. Henri Lambert, Mr. A. Davidson, Mr. B. T. B, Boothby, Mr. R.S. Norman, Mr. N. Deni son, Mr. L. E. Canning, Mr. J. Owen, Mr. E. Lansdowne, Mr. R M. Austin, "Mr. A. 8. Henchman Mr. P. C. Chen, Mr. K. W. Kwong, Mr. P. A. Cox, Mr. A. J./S, Park:

Text read from the printed page and cleaned; old type leaves the occasional error.

Your account