They soon made use of us and the second day we were working trains! vent of Mauch But it was a life—out at 4.90 am. and on the! footplate all day and turning in at! 20.80 p.m, You see we had all our own work of preparing the engines and making up the trains in addition, to the working of them. Still we curried on 0. K.
T was firing, as although I could manage the driving, I didn't know any of the roads sufficiently to risk! {taking a passenger train, and wel Hwere engaged on passenger work all [the time, the loyal regular men being employed in moving. heavy freight trains. I did the Manchester {to Wakefield and return trip the first day,—it was a good long run /and we of course had to pass through Summit Tunnel, 2,400 yards long. Believe me it was an experience I shall not forget, as after all, we were only amateurs at the game, ard tunnel not a pleasant idea. the prospect of breaking down in the
T went on to the Manchester, Bolton, Darwen, Blackburn, Accrington and Burnby run, returning the same day. This again meant fa tunnel job 2,100 yards long outside Darwen (the Sough Tunnel), fand, if anything, it was worse than the other as it is on a stiff bank However, we managed to keep time and after the first day the public [generally started to use the train and travelled with confidence, also happened on the other routes.
Tt wasn't so much that we were meeting the complete wants of the public so far og the train service was concerned "that effected the breakdown of the strike, but the moral effect of seeing the trains running in all directions and keeping good time wag the real blow 20 the railway cha}
Text read from the printed page and cleaned; old type leaves the occasional error.