Who Attempt to Prevent a Soft and Sticky Surface in the}
Hot Weather Nearing a Solution: Results of Interesting Experiments article appeared in the:
this time last year containing Daly News" about brief description of the Public Works Department's three asphalt plants and the methods then employed for mixing laying Asphaltic concrete sheet and asphalt road surfaces.
The article further went on to state that detailed investigations were being conducted with a view to obtaining a rond surface which would not, when the radiated temperature taken on the road surfaces averaged over 150°F. during the hottest days in July and August, become soft and sticky or push into ruts and corrugations: under the stresses caused by intense local trafic conditions. This problem may now be stated to be fast approaching definite solution. Shanghai being the first city this Improved road surfacing material is being used, it would, no doubt, interest the general public to learn how the solution of this complex problem has been attempt ed. To arrive at a successful solution, it was necessary:
The Temperature Extremes (a) To de the asphalt and fusing point without oxidation. To formulate a rule to govern the sizes and proportions the particles of very fine si and dust of which the surface was composed to give a mixture} of maximum density.
To establish a definite ratio between the asphalt and filer, on the lines of that already} established for water and cement in Portland cement concrete, The asphalt ased by the Public Works Department is known as Oil-asphalt which is a by-product from the distillation of asphalticil. The production of very carefully con by the manufacturers who employ highly skilled chemists to test the produce in the various stages of the refining and hardening process through which it goes before being placed on the market. Tt is thus possible for the consumer to order asphalts for road construction which have fusing points from 106°F. to 204°F, "The Solution to the problem would be simple if it wore possible locally to use an asphalt with a high fusing point, but this is by no means the ease og the, ductility of any asphalt has hech found to vary inversely as. the "fusing point," hence an oil-asphalt which would be hard enough to withstand the summer heat could not cope with the extreme local temperature range of 130°F, between summer fand winter and would be bound to rack in cold weather. For example, fan all-asphalt such as is at present being used in Shanghai gives at 41°F. a tensile strength of kilogrammes per square centimeter, while at 100°P. its tensile strength is zero, the fusing point of the asphalt' being 12°F.
Text read from the printed page and cleaned; old type leaves the occasional error.