The Archive · 1923

From Rodney Gilbert

Peking, Aug. 13.

For several weeks past the Chinese press has been full of malicious propaganda against the Asia Development Company, which recently completed a huge job on the lower Yellow River, closing a break in the dyke at Kungchiapa and retrieving 500 square miles of flooded farm land from the flood waters. There has been a persistent rumour to the effect that the foreign engineers had left the work unfinished and had run away, and that curing the recent high water the Yellow River had broken through a gap of 1,000 feet in the new dyke which they had built.

According to both Mr. Paul Page Whitham, the head of the American company, and Governor Hsiung of Shantung, this story is absolutely without foundation, The river has this ye: come within 18 inches of its historical high water record, but it is' not only running smoothly through the channe] which the foreign engineers created for it but, thanks to a groin that was built above the old break, is actually building up a silt beach along the new big dyke. Mr. Whitham pledged himself to take care of the new construction for a year. The high water menace is now past and if the recently constructed barriers stand the test during the remaining few weeks of the rainy season, they will from this time forth resist anything in the way of floods which does not greatly exceed the limit recorded in Chinese history.

Governor Hsiung, who is now in Peking, agrees with Mr. Whitham, who has just returned to Tsinan after a conference with him here, that the job is a "better and cheaper one than the Chinese could have done for themselves. It is the first time that a foreign engineer has had an opportunity meddle with the course of "China's Sorrow", and the first time that the traditional graft of the old Yellow River Bureau has been interfered with. Mr. Whit-ham dammed the devastating flood through the 1921 break in the north dyke at Kungchiapu, dug a new channel 6,000 feet long, employed 23,500 destitute farmers from the flooded area, and cheated the rapacious river within a period of seven months, at a total cost of $1,500,000. The Yellow River Bureau wanted $6,000,000 for the job and would not guarantee it for a year. When the officials of this office heard that the Tuchun and Civil Governor were contemplating the employment of foreign engineers, they cut their estimate over-night to

Text read from the printed page and cleaned; old type leaves the occasional error.

Your account