The Archive · 1937

JAPAN SPENDS MILLIONS ON OLYMPICS

Nation Will Mobilize All Resources to Ensure Success:

Most Elaborate Plans Announced WARDED both the summer Tokyo, June 19. and winter Olympic Games in 1940, Japan to-day mobilized virtually all its resources to ensure the success of the meets.

A total of ¥.45,000,000 will be spent on the summer games alone, and special facilities, such as free transportation for the participants and half rates for athletes and spectators.

Of the huge expenditure, the Japanese" Government will spend '¥.15600,000 on the stadium and other {oeilites connected' with the. proper Hunetioning of the events; ¥-20,000,000 for railway and trafic improvements and "Y.8,000,000 for radio and adver-{ising 'Al' proposals to select a new site discarding the existing. facilities the Meiji Shrine Grounds, were Laid aside and plans have been made to Femodel the existing stadium to seat 100,000: spectators.

nine-lane swimming pool, with a stadium capacity for 60,000 people will be built.

There will be two modern sporting halls for Indoor contests with a capa of 10,000 each, as well as accommodation for shooting and bicycling.

The Organizing Committee has engaged Mr. Kerner Klingenberger, technical adviser of the 1996 Gam at Berlin to act in a similar capacity uring the "Twelfth Olympiad. visitors, will be accorded both Yokohama; a field for equestrian events; a rifle range for clay target shooting; a cycling course; and) a long canoe course.

Present plans provide for the building of an Olympic Village at Kinuta, along the Tama River, about 10 Kilometres from the Stadium. The rounds will cover 800 acres. Wooden cottages will be built to house the athletes and the staffs, while special provisions will be made in the village to deal with baggage, customs, newspaper reporters, photographers, bank-{ng transaction, recreation and other Board and tent of a US. dollar, while {ree transportation will be provided and Louis Announces Plans to Retire Baseball as Olympic Event Baseball and canoeing will be recognized as regular Olympic events for the frst time at the Tokyo meet provided that a minimum of five na-Nous enlist in each event, under a riling of the 24th annual session of the International Olympic Committee held in Warsaw_ recently.

The German Government has presented the Japanese committee with '2. model of the Berlin Stadium to assist Japanese engineers in drawing their plans for the enlarged Meiji Shrine facilities.

The Meiji Shrine Outer Grounds, which cover an area of 125 acres, will contain the main and swimming stadia, The latter, surrounding, a

Text read from the printed page and cleaned; old type leaves the occasional error.

Your account