For some unknown yeazon the operations connected with the con sEevetion of the new railway bridge across the Sungeri, which {a to-confect Kirin with the Huhai Railway Has. been' stopped during the past four "days, the. local contractors: Stating' that, they have withdrava quite number of workmen of the instructions of the bridge contra tors. Whether this is owing to the Nery. severe cold or shortage Fendy cash Is not certain but. there
Building "operations ave suspended: fam bene doubt hat. even i€ the for a week or two, they. will be renewed very quickly as the Japanese futherites are," determined Rasten the completion of the new Rorean coast through lar and then to out plans for a town slightly north of Harbin through which the new railway will run, atid whose streets would end on the banks of the river Sungari fon each side of the new bridge.
Harbin railway station Korean main line at Old Harbin, where the Kirin railway would run across or under the Chinese Eastern Railway, but the planning of the new town to the north of Harbin father leads one to suppose that the station for Harbin will be erect ed. there, close to the river bank. The distance from this new town to what is called Harbin New Town is not more than four miles and half of this there is a good main road already constructed, on which motor cars can easily travel.
No information can at present be got as to how far the new line from the Kirin railway has been alrendy constructed northwards, but it, proposed to be conipleted by the autumn of this year.
Text read from the printed page and cleaned; old type leaves the occasional error.