High Standard Maintained

The water supplied to consumers throughout the "year has complled with the high standard required under our agreement with the Coun-and a considerable amount of research work has een carried out to ensure that this standard shall be maintained in the future and that any deterioration in the river water can be successfully dealt with. To render this water epidemiologically safe we have to effect a purification ten times as great as that required for Thames water.

We are still obtaining improved economy in our pumping plant owing to our policy of replacing older unit by more modern and economical machinery.

Our constructional programme during the year was again conservative, the total expenditure on new works being approximately the same as for 1998: the elevated reinforced concrete settling basin which I mentioned last year has now been completed and two new electrically driven primary pumps are now running.

Owing to our inability to lay new ruaing in the area west of the International Settlement, only two miles of mains were added to our distribution system during the year.

In addressing you in 1938 T reported the acquisition of land ad-Joining this office building, to provide for additional space required in the very near future. Additional office space has now been required for some time and during 1934 we had under consideration various schemes for the development of this property. However, when it became apparent conditions were becoming. In-Getaiely worse, we thought 1 ods visable to postpone the development contemplated, and in order to. provide the necessary additional space we have adopted the temporary' expedient of converting into offices the house that now stands on the property. The conversion is now in Drogress and Is expected to be ready for occupation in June.