During the month 682 calls were re-Jeeived and In connection therewith G20 patients were conveyed to various hospitals, Public Works Report for December The Commissioner of Public Works reports Weather—Rain fell on six days and frost occurred on eight days Brldges—The reconstruction, of Jdamaged Bridge No. 38 on Monument Road, in timber, was completed.

The replacement of Bridges Nos. 34. 144 and 45 on Monument Toad. by ft. diameter culverts, was completed and Bridge No. 35 was replaced by a Tength of 12-in. diameter. drain.

The replacement of Bridge No. 2 Rockhill Avenue, by a 4-ft. 6-i diameter culvert was completed.

Work on the replacement of Bridge by a arrieter culvert, was commenced.