The Archive · 1940

Special Transportation Requirements

With the hazards of the rapids in mind, the T.D.18 TracTracTor and winch-were ordered shipped in water-tight packages—not greatly to exceed two tons in weight, the capacity of the long native canoes, which are the only type of boat that can get upstream on this stretch of river.

Upon arrival of the tractor boxes at the mill—ten of them—men from the International Harvester Export Company's offices took the next small boat from Singapore to assist in getting the tractor up river and assembled. When the men arrived at the mill to set things going they found that the Dyaks had "unbuttoned" every part that they could and loaded them as they would best fit into a fleet of native canoes. Despite this, and also despite a very rough trip up river, the tractor was assembled and ready for work in four and a half days.

Although the woods superintendent had gained all of his logging experience in Siam, using elephants for power, he was enthusiastic about the tractor when he learned to drive it and felt the power of it on a tough pull. Alternately, the elephants and the tractor were driven, and the difference in power was amazing. The elephants for fifteen to 30 seconds could throw a hard pull against the chain, but the tractor put on greater power and kept it.

Although the tractor was new and stiff it was able to pull out the heavy teak logs at about one-third the cost by elephant. But as it also took the logs half a mile down creek to floodwater, and the elephants pulled only to the nearest creek, the spread was really greater. Furthermore, the T.D.18 hauled heavy timber through swampy ground and up steep gradients, work which would normally have demanded six elephants.

Impressive though the performance of the tractor was, it was overshadowed by the ease with which the machine was assembled. The precision manufacturing and easy accessibility of all parts of the tractor could hardly be better demonstrated. The entire tractor was assembled on a sandy hill, in the open, in rainy weather, in 4% days, with no special tools, and with Bush Dyaks for labour. The original factory breakdown of the tractor into ten packages had been torn down "willy-nilly" at the mill. After a wet week, on the river and getting a thorough coating of sand, every part of the tractor fitted into its place perfectly.

Text read from the printed page and cleaned; old type leaves the occasional error.

Your account