Municipal Engineer

on the subject are appended in full:

The reports by the Municipal Engineer Report ly the Municipal Engineer, ye ug tke Yangkinapang so that the en of the Cre k will be covered with of of water of ordinary tides.

Shanghai, 14th December, 1898.

Sir, 1 have given this matter my careful consideration and find that it will be practically impossible for the contractor to carry out the work on the lines—for the following reason:

The total length of the Yangkin; ang, about 000 feet and x fall of 4 fect ce Creek to the mouth of yangkingpang would be necessary whole fall of the Yangkingpang is ds the Whangpoo River, and owing to the bed of the Defence Creek being level as the upper portion ing pang, it would he impossible to get any fall westward without dredging the Defence Creek. This being the case it follows that in order to get a foot of water at the upper end of the Yangkingpang at ow water and allow for the proper fall, it would be necessary to dredge out the upper end of the Yang. Kingpang to a depth of about five fee below the present hed of the Defence he Creek.

This would be much too great a slilference in level, as all the mud fro the Defence Creek would be at once carried into the newly dredged Yangkingpang. Moreover in this particular section {between Yunnan Road and the Defence Creek) the houses in the English Settloment have been built right on the edge of a very insecure bunding put in by Chin To obtain one foot of water at low water it would be necessary to_diedge {o an average depth of between 5 and fect over the whole Creek and this in a th of only about 40 feet.

fh> Council's modern bundings would not he affected, bnt it would not be safe to to this depth in front of th stone bindings; the piles under which, are probably very defective.

The French Council's bundings, from the Yunnan to the Fokien Road Bridge, are in 2 very bad condition, and it would dangerous to do much dredging in front of them he Creek way dredged by this Con average depth of about two feet in 1877 and another contract was made about ten sears later by the French Conneit to regain deepen the Creek an re rage depth of two feet. This depth was however, exceeded, with the result that some of the bunding in the Englis side caved in. A little later the section between Honan and Shantung Roads gave way for the same reason, and it had be protected with sheet piling. The section of the stone bunding on the English side between the Bund Bridge and the Szechuen Road Bridge, which is very old, would probably give way if any depth of dredging were done.

The chief ides in the past in dredging the Yangkingpang seems to have been to clear the drainage outlets and keep the old bundings intact. The benefit of auch dredging from a sanitary point of view, so far as the Creek itself is cou-cerned, is extremely doubtful, The filling in and culverting of the Yangkingpang would be the finest public improvement ever carried out in Shanghai.

1am, Sir, Your obedient servant, CHarues Mayne, Municipal Engineer.