Haining Roxd, between Nor Road and Cherpoo Road.—1, feet run of granite kerb and channel and 346 feet run Of concrete pavement have been laid.
Alalaster Ruwl, between Winchester Road and Kune Road.—1L conerete street gullies, with iron gratings, have been laid th Thibet Roud, between Alabaster "ud Cadastral Lot 31, has been 1 Rowd, betesea North, Sow chew Road and Alabaster Road.—448 fect run of concrete pavement has been laid. feet run of 12" sewer has been Jaid and the road has been raised.
Road Extension. feet run, west of Macgregor Road, has been bricked and sanded. ait of Crdusteal Lot ivhti—122 feet "ran of Kerb and channel and the same length of concrete pavement has laid Chusan Read. feet ran of kerb and channel has been laid Works in Pr ditch on south side; filling in ponds and raising. ietwoen Park Road and ug kerb and channel.
Concession, Dricking and Western Dis. mel cud Yates Poli Hui nm Row cand Chapoo Ko ud, bricking.
Karath Rou.' hehiecen North Kewl and Mlabiester Roude—Layi street gullies and kerb and charm Eusttera District.
Wetmore Rod, North ut Yanytsepoo id.—Laying kerb and channel.
hiesrn Rud.—Laying street gullies.
Wayside Rowd.—Laying 3 circular sewer tubes.
Ward Road.—Laying street gullies and kerb and channel.
No. 9 Road Es nsion.—Widening and bricking.
Flour Mitt Rowl.—Constructing a 8 diameter culvert.
Text read from the printed page and cleaned; old type leaves the occasional error.