Ward Road.—The creek which comes on of this road is being culverted with a ster eirewtlar brick culvert, extending the Muirhead Road eastwards, and a length of 280° 0" has now been La Wah Hai Miao Road.—352' 6" ran of the 23" x16" cement. conerete sewer has now been laid eastwards from the North end of Muirhead Road, and the necessary manholes Dunt Road Extension.—A12" diameter stone-pipe drain has been laid between the Seward Road and the Sing a i Pang.
Yuhang Roar Extension:—134" run of 9" stoneware pipe drain has been laid temporarily, and the road bricked ant sanded, Cemetery Road has been widened about 20 feet in front of the old Canton Road Depat for a distance of 134 feet.
The passage on the East of, and parallel to, North Chekiang Road is being drained, raised and chip-paved, Drainage 28" x V6" crete sewer is being laid in Burkill Roar between the Defen and the Sze Pau tions, simultaneously.
The ¥ 0" 2°07 cement conerete sewer in Park Road has now been laid throughout the Tength tween Sinza and Bubbling Well Roads, The 23"
1G" cement concrete sewer has now been ka Vin the Bubbling Well Road Defence Cru to Park Road, w sewer in the laid from near the ax the and V6" ted. eu as to disd ge into the at point near the Bridge.
Theve 12" pipe dr ins have been laid across the Gorton Vioud in rious places, Parents,—Coment cone ote pavement on the footpaths the inno ron North Soochow Read between Broadway:
riy Rerds Boone Road between Miller & Nanzing wide have been North Road between Boone Road and Pek Chien Hong Pang.
Woosung Between Boone Road and Quinsan Roads, Yunnan Road between Nanking and Foo. chow Roads, Kiukiang Road between Honan and Shi tung Road.
Cleansing and Scarenging.—Au inspection of carts anid harness was held in the after-von of the 21st May and small prizes were ye for the hest turnouts. In his report Dr.
lock, who acted as judge, stys ponies are greatly improved, both in condition and the class of pony' hey are in excellent condition, apparent] well looked after, and T saw for the work. 1 vell d ons responsible for their upkeep."
G71 cartloads of garbage have been collected during the mouth, Concrete Ware.—5,560 pieces of concrete ware have been made at the Hongkew Depot during the month.
Labour.—The average number of labourers employed during the month, exclusive of contract work, has been 2,696, Quarry.—3.828 tons of Road Material have horn received from the Quarry during the month. the old Pah Sion Jao 751 new grave spaces have been laid out in the new section on the South side of the Cemetery.