Warranta issued Summonses served Warrants executed D. Bunce, Captain-Superintendent of Police Engineer's Report for February, The wood paving of the Nankisg Road, between Chekiang Road and the Defence Creek, has been commenst The footways are being raised to alit for considerable reduction in the leamber of the carriageway.
At Seward Road Bridge the steel girders and concrete floor nabs have been Inid on the southern half of the new structure, and the tramway track it being laid in its permanent position.
At Dixwell Road Bridge, over the Samginkinng, the whole of the falework has been removed. No appreciable deflection hax been observed and the settlement of the abutments has bee quarter of an inch. The work of msl ing up the o-rth approach it proceing; the "ath approach works not yet been put in hand.
Works in progress.—Filling in draining sidevditch in Babbling Wel Road, west of Medharst Roa Replacing two existing wooden briiges in Ferry Road, between Robisod Road and Ichang Road, py 4-{t. 6-in dismer-r and 3-f0 diameter concrete calvert, Woodpaving Nanking Road, between Chekiang Road and Defence Creek.
Ricsba stands on the Bund between Canton Roa and Nanking Road.
Repaire to North Szechuen Rossi Bridge New Plant House, Reserve Garden.
Reconstruction of Seward Rosd Bridge. riginal from