The Archive · 1902

Concrete Ware

The following concrete ware has been made at the Council's depots during the mouth Hongkew Depot, 9,861 pieces Sinza Read, 340, Greeks and River, Bundings.—The following wooden bundings have been repaired:-—Yangkingpang, between Fokien and Yunnan Roads, length 1,424 feet run.

Yangtszepoo Creek, length about 100 feet run.

'A new wooden bunding, 210 fect long has been constructed to Wayside Road.

Plans and sections are being prepared for banding the southern bank of the Soochow Creek between Thibet Road' and Fokien Road.

Bridges.—Small repairs have been made to the following wooden bridges Thibet Rod Bridge, Chapoo Road Bridge, Ningpo Road Bridge, Extensive Repairs are being effected to Seward Road Bridge.

Flour Mill Roid, x new bridge is being constructed to this road.

Cleaning and Deepening of Creeks.—Yangtszepoo Creek is being deepened neat the Garhage shoot.

Yavgkingpang Cleansing.—About 600 tons of mud was removed during the month. The Sz Pang, between the Soochow Greek and the Skew Bridga is being deepened.