Rails, steel grooved yirder rails throughout, 90 Ibs. per yard, gauge 4 ft. 8} ins., to be laid on the latest and most approved system.
We propose to Route No. 1. As fi No. 2. as the Country Club.
Nod. ner loop only. if In " Billian™ (or other suitable) wood pavement. or asphalt with stone setts next the rails (at the option of the Council). The remainder of the track would be edged with stone setts and filled in with Macadam.
Time ut Completion ut Construction Works, We propose to complete the following portions of the track within two years from date of signing of agreement with the Council, viz.:—
2 No. 1 te Vanztsz pou Cre No. 2 to Babbling Well 5 ts Inner lop, and the remainder not more than six to twelve months Jater. Much will depend upon the facilities offered to us by the Council, in the way of taking up por-tious of road bed in rapid succession.
Ocosherd Construction, Centre Pole Construction from Wayside to Yangtzepoo Creek; side poles and span wire for the rest of double track, side pole and bracket construction for the whole of the single track.
Opportunity shall be given to Residents in Shanghai to subscribe for shares in any Company that may be formed to construct and work Tramways under this concession: