The Archive · 1916

Artisans 367 Foremen 205 Mafoos 166 Convicts 174

Concreteware-—The following has been produced daring the month Hand-made 7,232 pieces Work Shelters.—There were 277 admissions daring the month and 326 bundles of wood chopped.

New Buildingt—Summary of work done during the month Description of Work Total "Buildings under construction 260 Plans submitted for approval 63 inspections re 81 Boundary walls erected 2 Carpenter sheds erected 5 Repairs to buildings effected 68 New shop front inserted 23 Shop front, ete., painted 238 a Alterations effected 34 Fences erected 24

Sign-boards erected 283 Temporary cloth sunshades erected 36 croschments reported and rectified 6 "These figures refer to the number of blocks of buildings under constraction, the number of houses would be considerably greater.

Survey Work, Official measurements of new lota 70 Boundary stone certificates issued 35 Consular lots surveyed 27 New Consular Lots placed under taxation 8 Oficial plans prepared 22 Sarveys made in connexion with tensions 68 Road Widenings and/or Ex-

Lots examined to ascertain whether they included roads andier waterways which are or may in future be of use to the publio 70 M. ©. R. Stones have been erected as follows Western District a Northern 3 Eastern yy 4

Cuas. H. Goprarry, Engineer & Surveyor.

Text read from the printed page and cleaned; old type leaves the occasional error.

Your account