Nanking, Nov. 22.
Construction work on. the projected short railway from the Shanghal-'Woosung branch line of the Nanking-Shanghai line to the civie centre in Kiangwan will be started in January next. The line, which is somewhat over two kilometres long, will. start from Kaochingmiao. station avd end at the junction of the San Min and Woosung Roads.
Tt Is understood the line will be Jcompleted in time for the National Track and Field Meeting to be held the new Stadium on National [Independence Day, October 10, next year—Kuo Min.
The rickshaw owners asked the Board to defer insistance-on new model rickshaws being provided to Wy. replace those withdrawn or con-that this geinned, until this stock has been lockwood and utilized. This the Rickshaw Board declined 0 do. The Rickshaw Owners Association representatives had several subsequent interviews with the Board, seeking a postpone~ Jment of the change to the new model Jand permission to use the whole, or Jat least large part, of these stocks.
[Conversations are continuing.
In regard to the 190 rickshaws Jcondemned in October, the owners Ihave been informed that these must joe replaced by the new model vehicles. In response, however. the plea of the owners, the time limit for the production of the new model nas been. extended.
Text read from the printed page and cleaned; old type leaves the occasional error.
