The Archive · 1929

Annex H—Declaration

The installations for distribution of electric power in the former Belgian Concession of Tientsin, the lines of high and low tension ch posts, transformation cabins with fittings," private connections and tro-meters, "which have been constructed with the approval of the Provisional Municipal Council the Belgiax Concession by the Compagne de Tramways et d'Eclairage Tientsin are the exclusive proerty of the said Company.

The Compagnie de Tramways et @'Belairage de Tientsin shall have the right to continue to supply the Uleetrie current on the territory of the former Belgian Concession, it being: understood that any extension of the network will require a previous authorization of the competent Tecal authorities.

Annex IIl—Declaration:

It is understood that if the. Fukien and Canton Guild can prove ina way considered as satisfactory that a portion of its Innd has been taken for the construction of road No. 1, 8 parcel of land of equal dimensions and contiguous to the property of, the said Guild will be gratuitously allotted to it from block S.

The name and the status.of the Rociété Anonyme de ta Concession on the contrary, this cannot be proved, the claim of the said Guild shall be definitely considered #8 not valid. the present Agreement. shall be applicable thereto, It is understood that the debts of the Municipality of the former

Text read from the printed page and cleaned; old type leaves the occasional error.

Your account