Specially Designed for Work, in Mouth of Haiho A successful Taunching was. nessed on October 8 when the tig Yung Fa glided gently into the water from the building berth of the New Engineering & Shipr building Works, Ltd.
This tug, dimensions of which ara-110-ft. O.A. by 105-ft. BLP. by 1.tte 3," 4s being builé forthe Taku Tug Lighter Cé,, Ltd, Tientsin, for service on the' Taku' Bar, and. the christening ceremony. wi ott performed by Mrs. H. E, Arnhol who was presented with a occasion by. the build The tag is spccimty, designed to, withstand. ice, which forms in large quantities during the winter at the mouth of the Haiho, and also: to capable of navigating: the Barat all conditions of tide. The vessel la also. to serve-o3 a. tender for passengers "from: steeniers.. whith owing to. their: great, draught a prevented-from crossing the Bar,
Text read from the printed page and cleaned; old type leaves the occasional error.